Quick answer: normalize every quotation to the same road layout, maintained lighting target, nightly dimming schedule, lowest-month solar data, autonomy and wind requirement. Then compare usable battery energy, real LED input, solar charging margin, photometric results, pole structure, documentation and warranty responsibility. Price per set is meaningful only after these assumptions match.
| Item | Supplier A | Supplier B | Required comparison basis |
|---|---|---|---|
| Lighting | Record result | Record result | Same road, grid, maintenance factor and target. |
| LED load | Actual W and stages | Actual W and stages | Same operating schedule. |
| Battery | Usable Wh | Usable Wh | Same DoD, temperature and autonomy assumptions. |
| Solar panel | Rated W and dataset | Rated W and dataset | Same lowest-month location data and loss factors. |
| Pole | Steel, geometry, coating | Steel, geometry, coating | Same wind basis and panel arrangement. |
| Warranty | Component terms | Component terms | Same scope, labour/freight and response definition. |
Amp-hours cannot be compared without voltage. First convert nameplate capacity to watt-hours, then review allowable depth of discharge, conversion losses, temperature effects and BMS limits. Ask the supplier to state usable energy under the design conditions. A large printed Ah value may still produce less usable energy if the system voltage or permitted discharge differs.
Model names and “equivalent watts” do not define energy consumption. Request measured input power and the programmed hours at each output level. A proposal with intelligent dimming may need a smaller battery than a full-output system, but it must still meet the lighting requirement during every defined stage.
Confirm that each supplier used the same road dimensions, pole positions, mounting height, tilt, outreach, maintenance factor and calculation grid. The photometric file should correspond to the offered luminaire and optic. Compare average and minimum results, uniformity, glare where applicable and connected load—not a rendered picture alone.
The quotation should identify pole height, steel grade, top and bottom dimensions, plate thickness, sections, base plate, anchor bolts, solar-panel bracket, luminaire arm and coating. Require the design wind basis and check that the offered calculation includes the actual solar panel and luminaire dimensions.
No. The panel must be compatible with the controller, battery and local solar conditions. Complete energy balance and charging limits matter more than one rating.
Yes. Different optical efficiencies can achieve the same road result at different input powers. Verify both with comparable photometric calculations.
Usable watt-hours under the declared design conditions are more informative than Ah alone, but cycle-life basis, BMS and temperature limits must also be reviewed.
A project may require a sample, pilot installation or factory acceptance process. The acceptance criteria should be agreed before ordering.
Use the solar street light tender checklist, explore all solar street lights, or ask Jieyao for a transparent project calculation.